Control of calcium build up in irrigation piping

CASE STUDY Olde Cypress, Florida RETURN ON INVESTMENT The Club faced a unique challenge with the pipe build up issue. Build up could have been removed with a chemical wash, but ultimately that chemical would have to be collected and disposed of because of environmental concerns. Secondly, the irrigation piping … Read More

Turf root mass increases 300% in four months

CASE STUDY Boca Grove Plantation, Florida   RETURN ON INVESTMENT In addition to managing the high bicarbonate water, the Care-Free Water Conditioner proved to be a cost savings over the traditional treatment. A cost analysis of the two technologies is shown below.   CONCLUSION Given the data above, the Care-Free … Read More